Wondering how long your project will take? Here's a realistic timeline from your first free estimate to the final walkthrough.
Day 0: Free estimate & design
We measure on-site, you choose color and pattern (with free visualization and AR), and you get an itemized quote. Scheduling follows approval.
Days 1–2: Excavation & base
We excavate, grade for drainage, and build the compacted gravel base — the most important phase for longevity.
Days 2–5: Laying & cutting
Pavers are set in your pattern with clean cuts and edge restraints. Most residential driveways and patios are laid in a few days.
Final day: Joints, seal & walkthrough
Polymeric sand, compaction, optional sealing, full cleanup, and a walkthrough with you. Typical projects finish in 3–7 working days depending on size and weather.
Frequently asked
Yes — heavy rain can pause base and jointing work for safety and quality. We build a little buffer into the schedule and keep you updated.
See it on your own home — free
Upload a photo for a free visualization, or book a free on-site measurement with AR preview.